- Experimental Study of the Combined Effects of Al2O3, CaO and MgO on Gas/Slag/Matte/Spinel Equilibria in the Cu–Fe–O–S–Si–Al–Ca–Mg System at 1473 K (1200ºC) and p(SO2) = 0.25 atm
- Carbonation of Na3VO4 Solution with CO2 for Recovery of NaHCO3 and NH4VO3: Kinetic Analysis of Carbonation Process
- Developing a Low-Temperature, Carbon-Lean Hybrid Valorisation Process for Bauxite Residue (Red Mud) Towards Metallic Fe and Al Recovery
- Magnetohydrodynamic Analysis of Load Shifting in Hall-Héroult Cells
- Material Flows and Waste Management of Titanium Products in China from 2005 to 2020
- Controlled Ledge Profile of Aluminum Smelting Cell Using Sidewalls Heat Exchangers Supplied with Molten Salt
- Combining Membrane and Zero Brine Technologies in Waste Acid Treatment for a Circular Economy in the Hot-Dip Galvanizing Industry: A Life Cycle Perspective
- Mechanical Activation-Assisted Recovery of Valuable Metals from Black Mass in the Form of Fe/Cu Alloys
- Simultaneous Application of Oxalic Acid and Sodium Dithionite for Synchronous Removal of Iron and Silica from Low-Grade Bauxite: Kinetics and Mechanism
- Scale-Up Study of Deoxidation of Off-Grade Titanium Sponge Using Magnesium Metal Under Argon and Hydrogen Mixed Gas Atmosphere
- Review on Comprehensive Recovery Valuable Metals and Utilization of Copper Slag
- Directly Recovering Lead and Recycling Electrolyte via Electrolyzing Desulfurized Lead Paste with PVDF as Binder
- Deep Electrochemical Purification of High Arsenic-Bearing Copper Refined Electrolyte
- Investigation of the Contents of the Stack Emissions of Iron Ore Sinter Plants With and Without Bag Filter
- Removal of Fe from Ilmenite Ore Powders Through Selective Chlorination Using CO and Cl2 Gas Mixture at 1073–1173 K in a Static Bed
- A Decarbonization Approach for FeCr Production
- Recycling of Iron and Alumina from Red Mud After Co-Sintering with Phosphogypsum
- Sustainable Recovery of Cobalt from Aqueous Solutions Using an Optimized Mesoporous Carbon
- Induced Currents in the Lining and Steel Shell of Submerged Arc Furnaces
- Correction to: Pilot-Scale Test of Flue Gas Recirculation for The Silicon Process